Sell Alcohol Factory

no image You May Also Be Interested In: factory metallic building sugar cane unloader wine alcohol
PROPOSAL OF SELL, DISMOUNT, REVISION And ASSEMBLY OF A UNIT PRODUCER OF ALCOHOL HIDRATADO And ANIDRO FUEL WITH NOMINAL CAPACITY OF 40 M3 DAY OF HIDRATADO, AS EQUIPMENT RELATION BELOW ACQUITTED BY SECTOR;

SECTOR SUGAR CANE RECEPTION - ONE BALANCES ROAD 60 TONS - TWO LATERAL UNLOADER TYPE HILLO 15 TONS - A ROLLING BRIDGE 10 TONS - ONE DRIFTS HYDRAULICAL 6,500 Kg - A METALLIC BUILDING FOR I DEPOSIT OF SUGAR CANE SECTOR SUGAR CANE PREPARATION - A TABLE ALIMENTADORA 45: WITH CHANGEABLE ELECTRIC DRIVE - A CUSCH-CUSCH OF STRAW ELECTRIC DRIVE - A METALLIC MAT WITH 30"OF WIDTH CHANGEABLE ELECTRIC DRIVE - A METALLIC MAT WITH 30"OF WIDTH RUBBER SHEET CHANGEABLE ELECTRIC DRIVE - A PICADOR NIVELADOR OF SUGAR CANE WITH 30"OF WIDTH ELECTRIC DRIVE - A SHREDDER OF SUGAR CANE COP 5 WITH 30"OF WIDTH ELECTRIC DRIVE - A ESPALHADOR OF SUGAR CANE ELECTRIC DRIVE SECTOR BROTH EXTRATION - A SET OF The FOUR TENDER OF 20 MILLINGS "X 30" WITH PRESS-ROLLER IN ALL TENDER Ones MARKS ZANINI ELECTRIC INDIVIDUAL DRIVE - A CUSH-CUSH OF BROTH - ONE BOLTS ROTARY PRESS FOR MIXING BROTH - A BOX FOR BOLTED BROTH - THREE VIBRATORY BOLTERS - A METALLIC BUILDING WITH ROLLING BRIDGE FOR MAINTENANCE And COVERING SECTOR VAPOR GENERATION - A 20 BOILER AGUATUBULAR TON. VAPOR HOUR, PRESSURE OF WORK 21 AUTOMATIZED Kgf/cm2 COMPLETE. - A METALLIC MAT FOR BAGASSE RISE. - A METALLIC MAT FOR BAGASSE DISTRIBUTION. - A METALLIC MAT FOR BAGASSE RETURN. - A BOX DAGUA FOR FEEDING OF THE BOILER. - A DESAERADOR FOR 20 M3/HORA. - TWO MOTOBOMBA FOR WATER FEEDING IN THE BOILER. - A METALLIC BUILDING OF COVERING. SECTOR PRI-FERMENTAGCO, FERMENTATION And DESTILLATION - A DORNA OF TWO HUNDRED FERMENTATION 300 M3. - FOUR DORNAS OF TWO HUNDRED FERMENTATION 75 M3 EACH. - THREE CUBAS FOR TREATMENT OF I LEAVEN WITH STRUCTURE 30 M3 EACH. - A SET OF DESTILLATION WITH PRODUCTION OF 40 M3 DAY OF ALCOHOL HIDRATADO And ANIDRO FUEL. - A SET OF DESTILLATION WITH PRODUCTION OF 40 M3 DAY OF ALCOHOL HIDRATADO FUEL. - THREE CENTRIFUGAS SPLITTING OF I LEAVEN 50 M3 EACH. - THREE TANKS ALCOHOL RESERVOIR 1,000 M3 EACH. SECTOR GENERATION OF ELECTRIC ENERGY - A TURBOGERADOR WITH CAPACITY OF 1.000 K. V. A EACH. - A PANEL OF GENERATION CONTROL. - A PANEL OF DISTRIBUTION FOR SECTOR. - A METALLIC BUILDING WITH ROLLING BRIDGE FOR MAINTENANCE. ELECTRIC SECTOR - A CENTRAL PANEL OF ENGINES And OPERATIONAL CONTROL FOR the SECTOR OF SUGAR CANE RECEPTION. - A CENTRAL PANEL OF ENGINES And OPERATIONAL CONTROL FOR the SECTOR OF SUGAR CANE PREPARATION. - A CENTRAL PANEL OF ENGINES And OPERATIONAL CONTROL FOR the SECTOR OF BROTH EXTRATION. - A CENTRAL PANEL OF ENGINES And OPERATIONAL CONTROL FOR the SECTOR OF VAPOR GENERATION. - A CENTRAL PANEL OF ENGINES And OPERATIONAL CONTROL FOR The FERMENTATION SECTOR And DESTILLATION. - A CENTRAL PANEL OF ENGINES And OPERATIONAL CONTROL FOR the SECTOR OF WATER CAPTATION. - A CENTRAL PANEL OF ENGINES And OPERATIONAL CONTROL FOR the SECTOR OF INDUSTRIAL ILLUMINATION. SECTOR OF BOMBARDMENTS - TWO BOMBS DIMENSIONADAS FOR LAUDERING OF SUGAR CANE. - TWO BOMBS DIMENSIONADAS FOR MIXING BROTH. - TWO BOMBS DIMENSIONADAS FOR BOLTED BROTH. - FIVE BOMBS DIMENSIONADAS FOR COMPOSED EMBEBIGCO. - TWO BOMBS DIMENSIONADAS FOR WINE LEVURADO. - TWO BOMBS DIMENSIONADAS FOR WINE DESLEVURADO. - FOUR BOMBS DIMENSIONADAS FOR ALCOHOL 1:. - TWO BOMBS DIMENSIONADAS FOR ALCOHOL 2:. - TWO BOMBS DIMENSIONADAS FOR WATER CAPTATION. - FOUR BOMBS DIMENSIONADAS FOR REFRIGERATION. - A BOMB FOR ALCOHOL SHIPMENT. - ALL THE INTERCONNECTIONS OF VAPOR, WATER, BROTH, WINE, ALCOHOL. - ALL The EQUIPMENT WILL BE REVISED And PAINTED BEFORE BEING IT DELIVERS In the PORT. OBLIGATIONS OF THE SUPPLYING COMPANY: - TO SUPPLY TO ALL THE EQUIPMENT RELATED ABOVE IN PERFECT STATE OF FUNCTIONING WITH GUARANTEE OF 90 (NINETY) DAYS. - MAN POWER SPECIALIZED And ENABLED TO ALL The SERVICES. - ALL ELECTRIC PROJECTS OF MANUFACTURE, CIVILIAN, ASSEMBLIES And. - MANUAL TOOLS, DERRICK, YOU SCHEME OF WELDS, USINAGENS ETC. - ALL the TRANSPORT Of the EQUIPMENT. - ALL SHIPMENT And UNLOADING. SERVICES THAT WILL BE EXECUTED; - DISMOUNT And JATEAMENTO OF ALL The EQUIPMENT THAT WILL BE ACQUIRED USED. - REVISION IN ALL The PARTS And THE ONES THAT WILL NOT BE WITH MEASURES OF PROJECT WILL BE SUBSTITUMAS. - PAINTING OF ALL The NEW And USED EQUIPMENT. - PACKING FOR TRANSPORT IN CONTAINER APPROPRIATE. STATED PERIOD OF BEGINNING And DELIVERY Of The INSTALLED EQUIPMENT: - the STATED PERIOD OF BEGINNING And DISMOUNTS Is IMMEDIATE, the STATED PERIOD OF REFORMS, MANUFACTURE And ASSEMBLIES And OF 130 (ONE HUNDRED And THIRTY) DAYS AFTER the SIGNATURE Of the CONTRACT. TOTAL VALUE OF ALL EQUIPMENT FOB PORT OF SAINTS U$ 5.250.000,00 (FIVE MILLION, TWO HUNDRED And FIFTY A THOUSAND DOLLAR) AMERICAN MODE OF PAYMENT: - 50% OF SIGNAL IN THE SIGNATURE OF THE CONTRACT. - 20% THIRTY DAYS AFTER the SIGNATURE Of the CONTRACT. - 10% SIXTY DAYS AFTER the SIGNATURE Of the CONTRACT. - 10% NINETY DAYS AFTER the SIGNATURE Of the CONTRACT. - 10% ONE HUNDRED And TWENTY DAYS AFTER the SIGNATURE Of the CONTRACT. Without more, we thank your attention, and since already we place it your disposal.
Supply Capacity
check out all details
Terms of Payment
see details
Terms of Sale
FOB Santos Brazil