Sell ESD-Control Vinyl Floor Covering

ESD-Control Vinyl Floor Covering You May Also Be Interested In: copper tape esd control vinyl floor covering floor covering vinyl floor vinyl floor covering
ESD-Control Vinyl Floor Covering
Features of tile
1. Conductivity
7It satisfies the electric resistance of UL 779&NFPA 99.
7Surface electric resistance:104-106(Ohms)
7Static decay time:5.000lts to zero 0.25sec.
2. Durability
7Excellect anti-wear, and anti-chemical properties.
3. Uniform gauge and color maintenance
4. Anti-load property
7There is no problem with machine movement, carrier vehicles or beds.
5. Permanent conductivity
7Conductive materials is distributed evenly in entire so that it has permanent conductivity.
6. Non-flammable

Conductive tile (installation method)
Proper supplementary materials shall be used for conductive tile installations. The function of electric conduction may be demonstrated only by exact methods of a skilled contractor.

Sequence of installation
1. Arrangement and preparation of floor. Dry conditon without contaminants.
2. Drawing of tile construction line on floor with chalk line.
3. Drawing of construction line of copper tape.
4. Application of adhesive (drying time 10-20 minutes after application of electro conductive adhesibe) . Use special adhesive only!
5. Installation of copper tape
(1) Install so that it will be crossed at center of tile.
(2) Leave allowance of about 12'' for copper tape at the place to be grounded.
6. Installation of tile
(1) Select start point of tile construction after adhesive dries.
(2) Install from center of chalk lines.
7. Welding of tile connection part
(1) Route V shape groove of about 1/2 times the thickness of tile along tile seam after adhesive harden sufficiently to hold tile in place. .
(2) Perform welding with welding machine using PVC welding rod of 3.5 mm diameter.
(3) Level the projecting part of welded part with chisel knife so that it may be level to tilesurface.
8. Grounding: Do grounding by connecting ground wire (copper tape) to grounding point if installation of tile is complete.

Maintenance and control
1 Remove detergent component completely after cleaning using neutral high quality detergent after removing dust for general cleaning. Rinse at least twice, more if necessary, with clear fresh pure water.
2 Clean contaminated parts carefully with mild detergent.
3 Do not use wax. If necessary, use polisher.

Uses of tile
Manufacturing, assembling and inspection factory of semi-conductor company
Clean room, computer room
Producting, assembling, laboratory, and test place of electronic product
Operation room of hospital
Place to handle explosives and flammable gas
Access floor
Telecommunication corporation (electronic switching room, etc. ) (finishing material of conduction room)

Supplementary materials
1. Copper tape 0.025TW20mmw
2. Electrical conductive adhesive: 104-106\.
3.3.5mm diameter for PVC welding
Brand Name
Supply Capacity
400,000 Pcs Per Month
PSB, GB/T 19001-2000--ISO9001&3A2000
Condition of Goods
Lead Time from Order to Shipment
14 days
Model Number
Minimum Order Quantity
Patents or Trademarks
Terms of Payment
L/C at sitht or T/T
Terms of Sale
FOB Shanghai
Warranty Coverage
10 years