Sell advanced alloy 110cc with 3 valves dirt bike

advanced alloy 110cc with 3 valves dirt bike You May Also Be Interested In: 110cc black wheels chromoly frame spokes valves
A. Front and rear Hydraulic disc brake
B. 110cc 3 valves engine
C. Long travel front absorber
D. Front Suspension: 35mm Long Travel Forks
Rear Suspension; Long Travel Shock w/ 14.5 inch or adjustable
Aluminum Swingarm
Aluminum skid plate
Alloy foot peg
Long/Folding gear shifter
Chromoly frame
Engine type: single cyclinder.4stroke. air-cooling. horizontaling set
Displacement: 110cc
Overall dimension (mm * mm * mm) :420 * 320 *280
Dead weight (Kg) :23.5
Max power (Kw/r/min) :6.0/8000
Max. toque (N. m/r/min) :8.0/5500
Compression patio:8.9:1
Cylinder dia. working stroke(mm * mm) :52.4 * 55.5
Ignition method: CDI
Lubricating system: pressure splash
Fuel consumption (g/kw. h) :367
Starting method: kick/electric start
Clutch type: manual. Wet multi-disc
Shift style: 4-gear shift
Seat Height: 26.75 inches
Handle Bar Height: 38.5 Inches
Ground Clearance: 9.5 inches
Brakes: Front: Hydraulic 198mm Disc
Rear: Hydraulic Disc
Final Drive: #420 Chain, 14T / 37T
Wheels: Black wheels w/ Heavy Duty spokes
Front wheel: 10" and 12" are both available
Rear wheel: 10"
Wheel Base: 38.5 inches/940mm
Tires: Performance Kenda tires
Front: 2.50x10
Rear: 2.75x10
Net weight (kg) : 60kg (125.8 lbs)
Fuel capacity: 0.79 US gallon. (3.0L,0.66imp gal) include reserve)
Grips: Dual Compound Grips
Seat: 40mm Tall gripper seat: Color: Black
Graphics: Full Shroud Graphics, Plate Backgrounds, Front/Rear Fender, and Bar Pad
Protection: Skid Plate
Passenger capacity: no passenger.
Product dimensions: 1430 x 760 x 950mm (56.3x30x37.4 in)
75sets/20", 162 sets/40"HQ.
Brand Name
Supply Capacity
1,000 units per month
Available Colors
Condition of Goods
47 x 18 x 32 inches
Lead Time from Order to Shipment
10 days
Model Number
Minimum Order Quantity
65 units
Power Requirements
110cc or 125cc
Patents or Trademarks
Terms of Payment
T/T or L/C at sight
Terms of Sale
FOB ShangHai
Warranty Coverage
labor and materials 90 days