Sell scaffolding system

scaffolding system You May Also Be Interested In: cross brace scaffolding scaffolding plank scaffolding system steel scaffolding
Pruduct Name : scaffolding
Detail:

The above photo is our logo on alibaba. It is two main products of all our products.

Frame scaffolding:

components of assembling

1. wooden planks-

clean site and lay the wooden planks at the ground in horizontal position.

2. jack base-

it is a base seat for adjusting and fixing the required scaffolding length above the wooden planks.

3. Main frame-

insert the main frame into jack base section in per pendicular position.

4. cross brace-

for fixing the main frame in each span of scafolding.

5. joint pin-

insert into the top of main frame for joining the required dimension.

6. horizontal frame or catwalk(steel scaffolding plank) -

it is a lateral pipe for frmaes used for fixing the main frame to complete the first floor scaffolding. (it can be erected with about 2 to 4 spans in each high rising floor alternately)

7. Wall tie(keeper joint) -

use wall tie to prevent the frames from swaying down due to strong wind and unstable ground. Fasten the ties to walls every 4 span horizontally and every 4 frame , vertically.
Brand Name
PUDE
Supply Capacity
20,000 Units Per Month
Condition of Goods
NEW
Lead Time from Order to Shipment
30 days
Model Number
1219
Minimum Order Quantity
1X40'GP
Terms of Payment
T/T
Terms of Sale
FOB QINGDAO